  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Staging area along Bloomfield Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-097.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Staging area along Bloomfield Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-096.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.   Staging area along Bloomfield Street,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-095.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 7A, looking toward Passaic and Orange Streets,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-093.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Scissor lift is hoisted out of Tank 7A by a crane,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-092.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Scissor lift is hoisted out of Tank 7A by a crane,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-091.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Scissor lift is hoisted out of Tank 7A by a crane,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-090.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Scissor lift is hoisted out of Tank 7A by a crane,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-085.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Scissor lift is hoisted out of Tank 7A by a crane,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-087.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Workers climbing up from Tank 7B,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-079.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Workers climbing up from Tank 7B,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-080.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Workers climbing up from Tank 7B,    Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-077.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Workers climbing up from Tank 7B,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-078.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 7B,  looking toward Passaic and Bloomfield Streets,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-076.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 7B,  looking toward Passaic and Bloomfield Streets, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-075.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Expansion joint repair on concrete walkway between Tank 7C and 9C,    Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-073.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Expansion joint repair on concrete walkway between Tank 7C and 9C,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-072.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Bobcat operator in Tank 7C,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-071.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Bobcat operator in Tank 7C,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-070.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 7C, looking toward Bloomfield and Passaic Streets,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-069.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 7C, looking toward Orange Street,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-063.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Sump pump hanging above Tank 7B,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-060.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Sump pump hanging above Tank 7B,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-059.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Removing sludge from Tank 7C,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-055.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Removing sludge from Tank 7C,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-054.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 7A, looking toward Bloomfield Street,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-052.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Worker power-cleaning walls in Tank 7A,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-051.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Worker power-cleaning walls in Tank 7A,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-049.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Worker power-cleaning walls in Tank 7A,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-048.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Worker power-cleaning walls in Tank 7A,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-047.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Workers power-cleaning walls in Tank 7A,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-044.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Workers power-cleaning walls in Tank 7A,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-041.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Workers power-cleaning walls in Tank 7A,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-042.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 5A (left) and 7A (right), looking toward Orange Street,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-040.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 5A (left) and 7A (right), looking toward Orange Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-039.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Staging area along Bloomfield Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-038.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Staging area along Bloomfield Street,    Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-037.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Staging area along Bloomfield Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-036.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Staging area along Bloomfield Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-035.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Staging area along Bloomfield Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-034.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Staging area along Bloomfield Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-033.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Staging area along Bloomfield Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-032.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Staging area along Bloomfield Street,    Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-031.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 1A, looking toward Orange Street,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-026.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Staging area along Bloomfield Street at intersection of Passaic Street,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-027.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Debris bags in Tank 1B,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-023.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 1B, looking toward Bloomfield Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-022.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 1B, looking toward Orange Street,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-024.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 1C, looking toward Bloomfield and Kearny Streets,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-020.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 1C, looking toward Orange Street,  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-021.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 3C (left) and 1C (right), looking toward Bloomfield Street,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-018.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Worker painting pillars between Tank 1B and 1C,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-013.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Worker painting pillars between Tank 1B and 1C,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-010.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Worker painting pillars between Tank 1B and 1C,   Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-009.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 1B, looking toward Passaic Street,      Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-008.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 1A, looking toward Bloomfield and Passaic Streets, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-006.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Walkway above Tank 1A, looking toward Passaic Street,    Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-004.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 1A, looking toward Passaic Street,    Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 100620-002.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Staging area along Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 086.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Worker in the paint mixing truck along Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 084.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Staging area along Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 085.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Staging area along Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 081.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Staging area along Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 078.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Staging area along Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 077.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Detail of clarifier in Tank 3A, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 075.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3A looking toward Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 074.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3B looking toward Orange Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 073.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Walkway above Tank 3B, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 071.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Workers cleaning up Tank 3B, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 070.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Worker cleaning up Tank 3B, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 069.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Worker cleaning up Tank 3B, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 068.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Worker etches terminating line in Tank 3C, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 067.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Worker cleaning up Tank 3B, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 064.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Workers cleaning up Tank 3B, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 063.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Expansion joint in concrete walkway near Tank 3C, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 061.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3C looking toward Passaic  Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 060.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Walkway above Tank 3C, looking toward Passaic Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 058.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 5C (left) and 3C (right) looking toward Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 057.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3C looking toward Passaic Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 056.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3C looking toward Passaic Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 055.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Workers preparing Tank 3C, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 052.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3C looking toward Orange Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 051.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3C looking toward Orange Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 050.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Worker wearing cloth mask during the first week back to work after Covid-19 shutdown. Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 049.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Worker wearing cloth mask during the first week back to work after Covid-19 shutdown. Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 048.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Worker wearing cloth mask during the first week back to work after Covid-19 shutdown. Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 047.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Workers cleaning up Tank 3B, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 045.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Worker wearing cloth mask during the first week back to work after Covid-19 shutdown. Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 043.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.   Vertical pillars dividing Tank 3B (foreground) and Tank 3A, looking toward Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 039.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Workers cleaning up Tank 3B, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 036.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3B, looking toward Orange Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 034.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Walkway between Tanks 3B (left) and 3A (right), looking toward Kearny Street.  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 032.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3B, looking toward Orange Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 033.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3A looking toward Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 031.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Expansion joint on walkway between Tanks 1A (left) and 3A (right), looking toward Orange Street.  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 028.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Cracked concrete on walkway between Tanks 1A (left) and 3A (right), looking toward Orange Street.  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 029.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation.  Tank 3A looking toward Bloomfield Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 030.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Workers wearing cloth masks signal to crew above clarifiers during the first week back to work after Covid-19 shutdown. Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 025.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Hoist on walkway between Tanks 1A (left) and 3A (right), looking toward Orange Street.  Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 027.jpg
  • Contract B-029A Final Clarifier Phase 3, Final Clarifier Concrete Rehabilitation. Tank 3A looking toward Orange Street, Passaic Valley Sewerage Commission.
    DPR-Odle_Newark 060520- 022.jpg
Next
  • Facebook
  • Twitter
x

Jersey Girl Stock Images

  • Portfolio
  • About
  • Contact
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area